Funktion Design Studio worked with the Mosinee Fire District to complete the design, bidding, and oversight for structural and code repairs to their existing 14,350 square-foot fire station. The fire station is a pre-engineered metal building which was originally constructed with deficiencies in the concrete footings at the columns, a lack of CMU wall reinforcement, and incomplete fire-rated assemblies.

Mosinee_fire_re-rodMosinee_fire_footing

 

 

 

 

 

 

 

Project Features

  • Helical pier installation for bearing at interior columns to minimize disturbance of surrounding elements
  • Extension of corridor walls to underside of deck to maintain a fire-rated exit system
  • No disruption to essential services of the fire station

Firm’s Involvement

  • Coordination of MEP design for HVAC, plumbing, and electrical services
  • Prepared design drawings for restoration of site and interior finishes at structural repair locations
  • Prepared bidding documents and assisted owner with the bidding process
  • Provided construction oversight

Project completed by our principals, prior to Funktion Design Studio, LLC, while employed with previous firms.